● HYDRO · CAMBODIA

Stung Tatay Hydroelectric Plant

Stung Tatay Hydroelectric Plant is a 246 MW hydro power plant in Cambodia. It was commissioned in 2015. It is operated by China National Heavy Machinery CORP (CHMC) [100%].

Open Stung Tatay Hydroelectric Plant on the map → Cambodia grid
246 MW Capacity
Hydro Fuel
2015 Online since
Cambodia Country

Plant details

Operator
China National Heavy Machinery CORP (CHMC) [100%]
Commissioned
2015
Country
Cambodia
Stung Tatay Hydroelectric Plant on the live map OPEN IN NRGMAP →

Frequently asked questions

How big is Stung Tatay Hydroelectric Plant?

Stung Tatay Hydroelectric Plant has 246 MW of installed capacity. It is a hydro facility in Cambodia.

When was Stung Tatay Hydroelectric Plant built?

Stung Tatay Hydroelectric Plant was commissioned in 2015, according to our public-data catalog. It is a 246 MW hydro plant in Cambodia.

Who owns Stung Tatay Hydroelectric Plant?

Stung Tatay Hydroelectric Plant is operated by China National Heavy Machinery CORP (CHMC) [100%]. Ownership and operator details are drawn from public sources and may differ from the current legal owner.

Where is Stung Tatay Hydroelectric Plant located?

Stung Tatay Hydroelectric Plant is in Cambodia. Open nrgmap to see it pinpointed on the map and explore the surrounding grid.