● WIND · CURAÇAO

NuKoraal Tabak Wind Farm

NuKoraal Tabak Wind Farm is a 23 MW wind power plant in Curaçao. It was commissioned in 2025. It is operated by Aspiravi NV [100%].

Open NuKoraal Tabak Wind Farm on the map → Curaçao grid
23 MW Capacity
Wind Fuel
2025 Online since
Curaçao Country

Plant details

Operator
Aspiravi NV [100%]
Commissioned
2025
Country
Curaçao
NuKoraal Tabak Wind Farm on the live map OPEN IN NRGMAP →

Frequently asked questions

How big is NuKoraal Tabak Wind Farm?

NuKoraal Tabak Wind Farm has 23 MW of installed capacity. It is a wind facility in Curaçao.

When was NuKoraal Tabak Wind Farm built?

NuKoraal Tabak Wind Farm was commissioned in 2025, according to our public-data catalog. It is a 23 MW wind plant in Curaçao.

Who owns NuKoraal Tabak Wind Farm?

NuKoraal Tabak Wind Farm is operated by Aspiravi NV [100%]. Ownership and operator details are drawn from public sources and may differ from the current legal owner.

Where is NuKoraal Tabak Wind Farm located?

NuKoraal Tabak Wind Farm is in Curaçao. Open nrgmap to see it pinpointed on the map and explore the surrounding grid.