Zongo II is a 150 MW hydro power plant in Democratic Republic of the Congo. It was commissioned in 2017. It is operated by Ministry of energy.
150 MW Capacity
Hydro Fuel
2017 Online since
0.4 TWh Tracked output/yr
Frequently asked questions
How big is Zongo II?
Zongo II has 150 MW of installed capacity. It is a hydro facility in Democratic Republic of the Congo.
When was Zongo II built?
Zongo II was commissioned in 2017, according to our public-data catalog. It is a 150 MW hydro plant in Democratic Republic of the Congo.
Who owns Zongo II?
Zongo II is operated by Ministry of energy. Ownership and operator details are drawn from public sources and may differ from the current legal owner.
Where is Zongo II located?
Zongo II is in Democratic Republic of the Congo. Open nrgmap to see it pinpointed on the map and explore the surrounding grid.