● HYDRO · TAJIKISTAN
Sangtuda 1
Sangtuda 1 is a 700 MW hydro power plant in Tajikistan. It was commissioned in 2009. It is operated by IPP.
700 MW Capacity
Hydro Fuel
2009 Online since
2.5 TWh Tracked output/yr
Frequently asked questions
How big is Sangtuda 1?
Sangtuda 1 has 700 MW of installed capacity. It is a hydro facility in Tajikistan.
When was Sangtuda 1 built?
Sangtuda 1 was commissioned in 2009, according to our public-data catalog. It is a 700 MW hydro plant in Tajikistan.
Who owns Sangtuda 1?
Sangtuda 1 is operated by IPP. Ownership and operator details are drawn from public sources and may differ from the current legal owner.
Where is Sangtuda 1 located?
Sangtuda 1 is in Tajikistan. Open nrgmap to see it pinpointed on the map and explore the surrounding grid.