● NATURAL GAS · TRINIDAD AND TOBAGO
Penal
Penal is a 236 MW natural gas power plant in Trinidad and Tobago. It was commissioned in 2017. It is operated by Power Generation Company of Trinidad and Tobago.
236 MW Capacity
Natural Gas Fuel
2017 Online since
1.4 TWh Tracked output/yr
Frequently asked questions
How big is Penal?
Penal has 236 MW of installed capacity. It is a natural gas facility in Trinidad and Tobago.
When was Penal built?
Penal was commissioned in 2017, according to our public-data catalog. It is a 236 MW natural gas plant in Trinidad and Tobago.
Who owns Penal?
Penal is operated by Power Generation Company of Trinidad and Tobago. Ownership and operator details are drawn from public sources and may differ from the current legal owner.
Where is Penal located?
Penal is in Trinidad and Tobago. Open nrgmap to see it pinpointed on the map and explore the surrounding grid.