Azerbaijan TPP is a 2,400 MW oil power plant in Azerbaijan. It was commissioned in 1981. It is operated by AzerEnerji.
2,400 MW Capacity
Oil Fuel
1981 Online since
1.3 TWh Tracked output/yr
Frequently asked questions
How big is Azerbaijan TPP?
Azerbaijan TPP has 2,400 MW of installed capacity. It is a oil facility in Azerbaijan.
When was Azerbaijan TPP built?
Azerbaijan TPP was commissioned in 1981, according to our public-data catalog. It is a 2,400 MW oil plant in Azerbaijan.
Who owns Azerbaijan TPP?
Azerbaijan TPP is operated by AzerEnerji. Ownership and operator details are drawn from public sources and may differ from the current legal owner.
Where is Azerbaijan TPP located?
Azerbaijan TPP is in Azerbaijan. Open nrgmap to see it pinpointed on the map and explore the surrounding grid.